ZJ30 750HP/180ton MOBILE RIG 3000M
1
  • ZJ30 750HP/180ton MOBILE RIG 3000M
2
views: 1440

ZJ30 750HP/180ton MOBILE RIG 3000M

Rate:
0.0000/5

( 0 reviews )

Item NO.: V015893 MOQ: 0
Weight:    0kgs
Package Size:  
 Price:
$998571.00
 Qty:
      $998571.00
 Shipping:   Calculate Shipping Cost

ZJ30 750HP/180ton  drilling rig

(Truck-mounted or trailer-mounted)

(Diesel drive)

The rig is especially suitable for short operating cycle drilling operation of shallow wells within 9,840' (3000m). The rig can also be used for water well drilling.

◆ Two (2) sets of diesel engines and Allison transmissions.
◆ Mature double engine compound box and drive system.
◆ 118/125ft(36/38m) mast with stiffened rectangular pipes.
◆ 14×8 reinforced chassis with good cross-country capacity.
◆ 5.5/6m foldable substructure and dog house.
◆ Top drive system is available.

Model no.

ZJ30/1700 C/T

Nominal drilling depth(114mm drill pipe) m

2000-3000m

Max.hook load ton/KN

180/1700

Max. number of line of travelling system

10

Nominal dia. Of drilling line mm(in)

29 (1 1/8″)

ID. Of swivel stem mm(in)

75 (3)

Drawworks power rating kW(hp)

550(750)

Rotary opening mm(in)

520(20 1/2), 698.5(27 1/2)

Rated power for each mud pump kW(hp)

735 (1000)

Mast height m(ft)

38 (125)

Height of substructure floor m(ft)

5.5 (16.5), 6(19.5),7.5(25)

Drilling floor clear height m(ft)

4.3 (13), 4.8(15.6), 6.3(20.5


Technical specifications for 750hp truck-mounted drilling rig
Item SUBJECT  SPECIFICATION  DESCRIPTION 
Unit

Qty.
 Main Summary  set 1
 
Main technical parameter
Normail drilling depth 3000m (4-1/2" DP) set 1
Max. hook load 1800kN
Traveling system 5×6
Mast clearance height 38m
Drawworks type Duble drums with WCB 324 auxiliary brake
Max. pull  280kN
Drilling wire dia. Φ29mm
Main diesel engine power 540bhp×2/1800-2100rpm
Power transmission system hydraulic+mechnical
Substructure height 6m
Rotary table opening size 520mm
Mud tank  240m3
Mud pump power and Qty.  1000hp×2
section AWorkover rig set 1
A1 chassis Driving type 14×8 set 1
Min turning Dia. 42m
Max. climbing capacity 20%
Min. ground clearance 281mm
Max. speed 45m/h
cab, with a simple driller's console.
A2
Diesel engine
Model of Diesel Engine CAT C15 set 2
Rated power 540bhp/1800-2100rpm 
Cooling type Water cooling
A3 Hydraulic transmission Model   Allison M5620AR set 2
Max. input power 567kW
Max. input torque   3254N.m
Max. input rotational speed   2500rpm
Gear ratio 0.67/ 1/ 1.35/ 2.01/ 2.68/ 4/ R5.15
Shift Num. 7
A4  compound Transfer case Max output torque 16000N.m
speed 2100rpm
A5
Mast
The mast is up to the API SPEC 4F.  set 1
Type Double-section, hydraulic telescopic
Max. static load  180t
Working height 38m
Racking board height 21.7m23.2m24.2m 
Chosen by user
Slant angle
Anti-wind capacity Full thrible 110km/h (10 grades)
with one set derrick man escape device, fall prevention device, and derrick climb assist system.
A5.1 crown blcok capacity 180t set 1
sheave no. 5
wireline dia 29mm
A6 Cathead cylinder Effective stroke 1500mm set 1
Max. pull 110kN
Working pressure 14Mpa
A7  Dealine anchor and weight indicator Model JZ250 set 1
A8 Substructure Drill floor Height  6m set 1
Area (L×W) 7.5m×6m
Structure   6-pole, swing up
Clear height   4.8m
Max. load for Ratory table bearing beam 1800kN
Setback area 3000m4-1/2 ” DP
It includs rat hole and mouse hole,tongs tail devcie,V-door slide, handrail and escape device.
A9 Drawworks Model JC28/11 set 1
Input power 550kW
A9.1 Main drum Drum body length 1045mm set 1
Drum body Dia.  560mm (with 1-1/8"Lebus groove)
Brake rim Dia. 1168mm
Brake rim width 275mm
Wire rope  29mm
Max. fast pull  280kN
Full four-lays capacity when working 270m
Max. speed of fast line   1.5m/s
A9.2 Sand drum Max. fast pull 110KN set 1
Drum body length 910mm
Drum body Dia. 345mm
Brake rim Dia. 970mm
Brake rim width 210mm
Clutch model ATD124H Axial thrust disc
Drum capacity 2000mΦ15mm Wire 
A9.3 hydraulic disc brake caliper qyt. working caliper 2 pcs, and safety caliper 2 pcs set 1
diameter of braking disc 1450mm
thick of braking disc 60/40
cooling system air cooling
torque of working brake 75kN.m
torque of packing brake 60kN.m
torque of emergency brake 135kN.m
A9.4 Assist brake Model WCB324 set 1
Max. slide rotational speed  715rpm
Max. rotational speed, free wheel  1200rpm
Brake torque 33.9kN.m0.55Mpa
Heat power   604kW
Displacement, cooling water   307L/min
A10 Rotary table transfer device including bottom chain box, up and down gear box of rotary table and climbing device of transfer shaft. set 1
Clutch model ATD-318H air sac push packing type
lubrication splash lubrication
Shift Num. 5F+5R with anti-reverse device
A11
Right angle gearbox 
Max. input torque 16000N.m set 1
Max. input rotational speed 2500rpm
Speed ratio 1.667
A12 Traveling hook Model   YG-180 set 1
Max. capacity 1800kN
OD of pulley 915mm
Qty. of pulley  4
Rotational angle of hook 360°
Wire Dia. 29mm
A13 Swivel Model   SL225 set 1
Max. Working pressure 35Mpa
A14 Rotary table Model   ZP-205 set 1
Max. size Φ520mm(20.5")
Max. rotational speed 300rpm
with master busing and rotary table drive box
A15 Hydraulic winch Model YC-5YC-3 set 1
Max. pull 50kN30kN
A16 Hydraulic pump Model P25 set 1
Max. displacement 165ml/r
System working pessure 14Mpa
Hydraulic oil model winterL-HM32/antiwear hydraulic oil
summerL-HM22/antiwear hydraulic oil
A17 Electrical system It consists of low & high voltage control system.  24V set 1
AC220V for lighting, AC380 for water cooling pipe
The low voltage control system is supply power by generator driven by diesel engine, the working voltage is 24V, it is mainly used to indictor light of control system and diesel engine start. 
The high voltage control system control light and power system of water recycling cooling pipeline by explosion-proof control box. 
A18 Operating and control system It can coordinate to complete the drilling via harmonization of hydraulic system, pneumatic system , electric system. It consists of operating valve and instruments.  set 1
A19 Mud boat set 1
A20 elevator link capacity 2250kN set 1
A21 drilling line spool to be loacted on the ground with 1-1/8" drilling line 600m set 1
A22 driller's cabin all the operation system is centralized at driller's cabin set 1


 
No comment
Total 0 records, divided into1 pages. First Prev Next Last
View History
Business time
9:00-22:00
  • Email:support@rig123.com